Planning information for eastern Idaho property owners. Final scope, design criteria and price are confirmed for your project.
Four floor choices, four different scopes
No interior floor
Removes the interior floor allowance, while structural footings remain. Ground conditions, drainage and intended use still need review.
Gravel finish
Adds a simple aggregate-floor allowance without a concrete slab. Confirm preparation, material and finish expectations with Jed; a loose surface and a verified prepared pad are different scopes.
4-inch concrete planning allowance
The sample package includes a standard base, vapor retarder, placement and finish. Four inches describes a budgeting assumption, not a blanket recommendation for vehicles, lifts or heavy equipment.
6-inch reinforced concrete allowance
A thicker slab and reinforcement allowance costs more in this model. The correct mix, reinforcement, joints, base and loaded areas still come from the actual design and equipment requirements. “Thicker” by itself does not resolve every loading condition.
Tell Jed what sits on the floor
Bring the intended vehicle/equipment loads and any lift manufacturer requirements. Point loads, anchors, thickened areas, aprons and future changes may need different details.
Discuss base preparation, moisture control, joints, curing and the construction schedule with the slab contractor. Slab work and bulk site earthwork should have clear boundaries so neither is forgotten or charged twice.
Shell, insulation or interior liner?
Enclosed, uninsulated shell
No insulation allowance is selected. Roof/wall condensation and weather-control details still need a plan.
Insulated enclosure
Adds a sample allowance across the modeled enclosure surfaces. The prototype does not promise an R-value, tested assembly or heated-shop performance. Material, air/vapor control and installation details need to be coordinated.
Insulation plus interior steel liner
Adds an interior steel-finish allowance as well as insulation. A liner is a finish choice, not a complete electrical, mechanical or fire-protection scope.
Planning a heated shop or a future conversion
An insulated building still needs an appropriately scoped heating/ventilation strategy and electrical service. HVAC, plumbing, service connections and living-space finishes are excluded from the current prototype.
If you expect a ceiling, radiant heat, a restroom or future living space, say so early. Those choices can affect assemblies, loads, utilities and the approval path. They are useful reasons to develop a custom scope with Jed.
Interested in high-performance home construction? ↗Sources & further reading
- National Ready Mixed Concrete Association: Concrete in Practice — concrete ordering, moisture, joints, curing and other slab topics.
Floor packages and insulation amounts are illustrative estimating inputs. The builder and qualified project team establish the actual assemblies and specifications.
Prototype cost examples describe the current sample model. They are not engineering specifications or published Redstone bids.