Planning information for eastern Idaho property owners. Final scope, design criteria and price are confirmed for your project.
What the four scenarios mean
The designer’s structural scenario changes one sample cost allowance: the structure and footing assemblies. It does not change the whole project by that percentage and it does not specify a snow-load rating.
Unknown
The default adds 10% to the reference structural allowance while design criteria remain unverified. This is a placeholder for uncertainty; it is not proof the allowance will cover the final design.
Baseline
Uses the reference structural allowance without an extra load factor. “Baseline” does not mean approved, minimum-code, or suitable for every valley property.
Increased · +15%
Adds 15% to the reference structural allowance. It lets you see the effect of a larger structural budget. It does not select a known engineered assembly.
Higher · +30%
Adds 30% to the reference structural allowance. This does not mean 30% stronger, a particular roof rating, or a guaranteed Teton Valley price.
If you do not have reviewed design criteria, leave the selection at unknown. Jed can help establish the right scope with the supplier and design team. These scenario factors are provisional and can change as the estimator is calibrated.
Snow load: why the engineering matters
Snow load describes snow weight, not simply snow depth. Ground snow criteria are a starting point; roof loads also depend on roof shape, exposure, heating conditions and drifting. A town name alone does not establish the requirements.
Engineering follows the forces through the structure and checks the connections and supporting foundations. A more demanding site or roof can require different trusses, posts, bracing and footing details as well as additional design work. The budget can change with both the engineering and the components it specifies.
Confirm the exact address, elevation and current city/county criteria with Jed and the qualified design team. The planning selector does not calculate psf or approve a design. Leave Unknown selected until the project has been reviewed.
Why width and door location matter
Post-frame columns, trusses, secondary framing, bracing and foundations work as a system. Increasing clear span or changing a large opening can affect several parts of the structure.
In this prototype, width and height factors are sample estimating rules. Sidewall overhead doors have a separate starting structural allowance based on Jed’s input. Neither replaces an actual beam, column, bracing or foundation design. An opening that fits on the picture still needs that review.
Explore end-wall versus sidewall doors ↗What the ground contributes
The selected slab is not the entire foundation. Footings, posts or post-base systems have their own requirements, and soil conditions can change those details.
Tell Jed about fill, soft ground, groundwater, rock, retaining work, existing slabs and any soil report. A finished-looking pad can still need verification before the foundation is planned.
Read the ground-condition questions ↗What to bring to Jed
- The property location, intended use and any jurisdiction guidance.
- The proposed width, length, height and roof shape.
- Door locations and real vehicle/equipment clearances.
- Any future ceiling, storage loft, solar, lift or other planned loads.
- Existing surveys, soil information and pad records.
The online number starts a planning conversation. Jed reviews the complete scope and prepares the written proposal; design and permit requirements are confirmed for the site.
Sources & further reading
- FEMA / U.S. Fire Administration structural load-path overview — how roof forces travel through connections to foundations.
- U.S. Department of Energy / PNNL snow-load guide — snow weight, roof configuration, drifting and site-specific design.
- Teton County Idaho design standards checklist — a published example of address/elevation-specific design questions; confirm current requirements.
- National Frame Building Association engineering resources — post-frame system design and technical references.
Prototype cost examples describe the current sample model. They are not engineering specifications or published Redstone bids.