Your land.
The other half of the plan.

A level-looking spot and a clear driveway are a starting point. The useful question is what has to happen before the building can go up.

Back to your barn designer ↗

Planning information for eastern Idaho property owners. Final scope, design criteria and price are confirmed for your project.

An allowance is a starting scope

The designer offers several bulk-earthwork scenarios: not reviewed, a prepared pad, light preparation, grading, difficult conditions and a raised-pad example. They help compare budgets; they are not a measured excavation bid.

The prepared-pad choice has $0 bulk earthwork in the modeled scope. Foundations and the selected floor package remain separate. The raised-pad example starts with the owner-reported roughly $20,000 cost as a preliminary allowance. It is an example, not a cap or a standard charge for every floodplain.

Questionnaire answers identify concerns without applying automatic surcharges. The exception is responsibility: choosing customer-provided earthwork removes Redstone’s earthwork allowance and clearly labels it as outside the total.

Building on a hill or changing the elevation

Describe the slope across the entire work area, not just a spot under one corner. Ask about cut, fill, working space around the footprint, driveway grades, pad edges and any retaining work.

Fill may need to be imported, and excavated material may need to be removed. Actual quantities depend on the design, ground and hauling/compaction plan. Identify who measures the work, where material comes from, where surplus goes and what happens if unsuitable ground is encountered.

Floodplain or past flooding

Tell Jed if maps, local records or your own experience suggest flood risk. Ask the responsible local authority about the building location, required elevation, drainage, grading/fill and approvals before planning the pad.

Adding three feet of fill is not a universal answer. The project needs a site-specific approach, and fill may affect more than the footprint of the building. The questionnaire keeps this discussion visible without pretending to approve a floodplain design.

Soils, existing fill and old foundations

Flag soft or organic material, rock, unknown fill, wet ground, buried debris, old slabs and abandoned foundations. Mention any soil/geotechnical report and whether a previous pad has compaction records.

A gravel surface alone does not establish what is underneath it. Ask who verifies suitability, who pays for testing or correction, and whether the foundation or slab design must change. Existing concrete should be reviewed for the new use and layout before assuming it can stay.

Where water goes

Think about spring runoff, irrigation, ponding and seasonal groundwater. Ask where roof runoff and surface water will discharge and whether gutters, swales, ditches, drains or dewatering are needed.

Coordinate the finished pad, floor elevation and exterior drainage with the project team. The questionnaire asks whether there is a plan; a “yes” is information to discuss, not a verification that the plan works.

Trucks, lifts and utilities

Check the route to the pad: gates, narrow turns, soft surfaces, steep drives, bridges, culverts, overhead lines and road restrictions. Allow room for unloading, material storage and the equipment needed to set the building.

Identify buried and overhead services, septic areas, wells and old tanks. Coordinate the applicable utility-locate process before excavation, including any private lines needing separate attention. New service, trenching, connections and upgrades require their own scope; they are excluded from this prototype’s building model.

When the customer prepares the site

Agree a written handoff before work starts: pad location and extents, finished elevation, accepted materials, compaction evidence, drainage, access and who corrects a pad that does not meet the agreed requirements.

The designer excludes bulk earthwork from Redstone’s total when you select customer responsibility. It does not make that work free and does not automatically approve the finished pad. Footings and the selected floor remain part of the selected building scope unless the written proposal says otherwise.

Boundaries, approvals and timing

Confirm property lines, setbacks, easements, irrigation rights-of-way, the responsible jurisdiction and the intended building use. Ask about clearing, demolition, disposal, access/crossing approvals and seasonal conditions that could affect the work.

Have the property location, any survey or pad records, photos of access and the proposed footprint, and a rough intended schedule ready for the conversation. The questionnaire stores preset planning answers with your design; bring records to the project conversation.

Work through the site questionnaire ↗